English
EspaƱol
Si necesitas completar
en espanol pulsa aqui
Daily Stationary Scaffold Inspection
Project Name:
*
Inspected by:
*
Foreman:
*
Date
Mon
Tue
Wed
Thu
Fri
Sat
YES
NO
N/A
YES
NO
N/A
YES
NO
N/A
YES
NO
N/A
YES
NO
N/A
YES
NO
N/A
Comments
Scaffold components and planking in safe condition for use and planks graded for scaffold use
Frame spacing and sill size capable of carrying intended loading
Competent person in charge of erection and to inspection
Sills properly placed and adequate sized
Screw jacks been used to level and plumb scaffold instead of unstable objects
Base plates and/or screw jacks in firm contact with sills and frame
Scaffold is level and plumb
Scaffold legs braced with braces properly attached
Guard railing in place on all open sides and ends
Overhead protection or wire screening been provided where necessary
Scaffold been tied to structure at least every 30' in length and 26' in height
Free standing towers been guyed or tied every 26' in height
Brackets, tube and clamp, and accessories been properly placed with nuts and bolts tightened
Scaffold free of makeshift devices or ladders to increase height
Planks have minimum 12" overlap and extend 6" beyond supports
Toe boards properly installed
No forward fall hazards presents (large openings on building)
Conditions such as power lines, wind loading, etc. controlled
Safe access to scaffold without climbing on cross braces
Front face within 14 inches of the work or within three feet for outrigger scaffolds
Notes:
Print Name:
*
Employee ID:
*
Signature:
*
Clear Signature
Upload Files :
Foreman Email:
Other Email:
Cancel
Submit