English
EspaƱol
Si necesitas completar
en espanol pulsa aqui
Fraco Inspection
Name of user :
*
Name of site :
*
Number/street :
City :
Province/State :
Type of lifting unit :
Single mast
Double mast
Serial :
Autostable
Walls attachments
FRH on lifting unit
Serial :
Inspected items
Checked
Comments
Ground safety perimeter
Stability of the floor surrounding the base of the platform
Levelling of the base and verticality of the mast
Stabilizers/wooden blocks
Tires and Wheels / Steering, Drives
Lateral and vertical clearance of the platform
Condition of platform power cable
Structure of bridge and extension sections
Mast structure (rail/bars)
Safety bolts, nuts and pins
Condition of platform floor
Condition of plankings/ planking attachments in place
Outriggers
Guardrails and protective wire mesh
Mast end and mechanical descent stop
Anchor strength: bolts and pins in place
Loads distribution on the platform
Warning sign/stickers
Fuel/engine and hydraulic oil level
Condition of hydraulic hoses
Presence of leaks
Condition of electrical wiring
Battery and cables securely fixed
User Manual, Daily inspection grid
Platform Operation / Safety Mechanism
HFR Operation, Cable and hook status
Load maintained
Emergency stop button
Emergency descent
Fire Extinguisher
Comments :
Inspection Date :
*
Name of operator :
*
Name of employee :
*
Employee ID :
*
Foreman Name :
Project Name :
Signature :
*
Clear Signature
Upload Files :
Foreman Email:
Other Email:
Cancel
Submit