Mast Climbing Scaffold Inspection
Project Name:
*
Inspected by:
*
Foreman:
*
Date
Mon
Tue
Wed
Thu
Fri
Sat
YES
NO
N/A
YES
NO
N/A
YES
NO
N/A
YES
NO
N/A
YES
NO
N/A
YES
NO
N/A
Comments
Safety perimeter in place
Ground is stabile at base area
Base and mast are level and plumb
Overhead clear of obstructions to elevate platform
Bridges and extensions in good working condition
Tower structure, rungs in good condition
All bolts/pins installed
Platform deck in good condition
Step-down planks in good condition
All guardrails installed
No forward fall hazards presents (large openings on building)
Wall ties placed no more than every 20' vertically
Loads on platform distributed evenly
Fuel, engine and hydraulic oil at manufacturer's recommended levels
Hydraulic hoses in good condition
Electrical wiring in good condition
Battery and cables properly fixed
User guide on the platform
Operation of the platform/safety mechanism
Emergency switch buttons functional
All operators properly trained
Crane (if applicable)
All bolts and pins installed
Fuel, engine and hydraulic oil at manufacturer's recommended levels
Hydraulic hoses in good condition
Electrical wiring in good condition
Cable and hook in good condition
Cable stop properly installed to prevent over-lifting
Controlled access zone in place below lifting area
All operators properly trained
Notes:
Print Name:
*
Employee ID:
*
Signature:
*
Clear Signature
Upload Files :
Foreman Email:
Other Email:
Cancel